Project Description

This corporate project included the renovation of a cafeteria with the addition of a training room. A large moving partition allows the training room to open to the main area of the cafeteria for town hall meetings. The challenge with this project involved two different configurations for the training room and the requirement to matrix training room audio and video with the main cafeteria. The solution involved the use of two separate projection/screen systems along with two floor box connection points for the portable lectern. A distributed video matrix system with wireless video capability provides the ability to route content from multiple sources to the desired destinations.

 

Project Details

Client: Alcon
Date: 2014
Systems: Audio Visual